Barcelona – French border this bridge was designed with three
spans and hollow core slab. Its total length is 80.60 m with 24.00 –
32.60 – 24.00 m spans, being 15.00 m width.
L’Aldea (Tarragona) in the juction with the Railway. The length of
the structure is 145 m and the available clearance is 12 m.
sorroundings of Madrid, and elevated turnabout was designed. The
composite structure has two spans of 45 m each and two twins
decks with radious 50 m
- French border, this viaduct has 130 m long and 2.85 m depth. It
was designed with precast beams and providing full structural
continuity in the supports by means additional prestressing.
HSRL to the French Border. It is a isostatic 45m span structure,
being the abutment fully encastred into the concrete deck as an
integral bridge.
the HSRL to the French border. The viaduct has two spans of 30 m
each, with hollow core concrete section. Its erection was made
segmental due to temporary traffic diversion.
Galicia se han proyectado un total de 15 pasos superiores de
diversas luces geometrías, en todos los casos manteniendo
tableros prefabricados de vigas y optimizando en todo lo posible la
subestructura (pilas, estribos y cimentaciones).
la autopista A - 35 se proyectó este paso superior formado por dos
vanos sobre el que circula el FFCC. El dintel está formado po una
losa y la estructura se completa con unos estribos pilotados que
sostienen los derrames de tierra debido al fuerte esviaje.
el Río Valderaduey. Para ello se proyecto un puente de tres vanos
con luces 30 - 47 - 30 y sección cajón que permite dar continudad
al trazado. La estructura se construyó en una sola fase y con
cimbra completa.
tres estructuras formadas por un tablero de vigas prefabricadas
con ala inferior extra - ancha (simulando una losa continua) y unos
estribos pilotados a modo de pantallas. Durante la construcción de
las estructuras la calzada siempre estuvo en servicio.